Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 520 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the construction of a new part single storey, part two storey detached dwelling, including an associated single storey detached garage, a new site entrance, a new wastewater treatment unit, and all associated site works
The erection of a dwelling house, partly single storey and partly 2 storey, together with the installation of an on-site sewage treatment system and all associated site development works
Retention of carport and shed to the side (North) of the existing dwellinghouse as constructed and retention of extension to the rear (East) and minor elevational changes to the existing dwellinghouse as constructed
(1) Demolition of existing dwelling (2) Construction of a new dwelling (3) Material change of use of external store to office and store with elevational changes and (4) Installation of septic tank and percolation area and all associated works.
(1) Retain dormer development within originally permitted roof structure, (2) retain dormer extension to rear of originally permitted dwelling (3) permission to install domestic effluent treatment plant to replace existing septic tank together with all associated site development works.
Construct a dwelling house, new vehicular entrance, domestic garage, install a waste water treatment system & percolation area and all associated site works
The brief summarizes the pattern across all 520 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/4983The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief