Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 147 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to retain the bungalow, vehicular entrance and site boundaries as constructed under Planning Ref. No. 2173/76, and for permission to decommission the existing septic tank and the installation of a new wastewater treatment system and all associated site works.
Construct a dwelling and all associated site works.
Construction of ground and first floor extension to side of dwelling and alterations to front and rear of dwelling and all associated site works
Construction of dwellinghouse, detached domestic garage, entrance, installation of treatment unit and percolation area and all associated site works
Permission for development which consists of the construction of a new Wastewater Treatment Plant (WwTP) to replace the existing public and private WwTP’s currently servicing the agglomeration. The development will consist of the following: 1) Inlet works, including: 2 no. gravity inlets from the existing public WwTP & the private WwTP, full flow to treatment pumping station, inlets screen. 2) Primary treatment, including: 2 no. primary settlement tanks, 2 no. rotating biological contactors. 3) Secondary treatment, including; 2 no. Humus Tanks. 4) Discharge works, including; final effluent collection chamber, final discharge manhole, final effluent gravity pipeline and headwall along the Lisduggan North Stream. 5) Sludge treatment works, including; primary sludge pumping station, 1 no. sludge holding tank, 3 no. sludge drying reed beds, mixed liquor returns pumping station. 6) 1 no. stormwater storage tank and pumping station. 7) Construction of a new solar farm to provide a source of renewable energy to partly supply the WwTP. 8) 1 no. control and administration building. 9) Ancillary site works, including: upgrade of the existing entrance and access road from the L1042 roadway and construction of paved site roadways including associated parking. Installation of instrumentation, monitoring equipment and controls in accordance with Uisce Éireann’s technical standards. General groundworks, fencing, landscaping, ducting, pipework, manholes/chambers and drainage works including for filter drains, surface water pipeline and a swale. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Permission to construct a new dwelling house
The brief summarizes the pattern across all 147 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/5722The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief