Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 245 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1. Demolition of existing timber chalet, 2. Permission for construction of dwelling house, 3. Installation of waste water system, 4. New site entrance, 5. All associated site works. A Natura Impact Statement (NIS) has been prepared and the planning application and the NIS will be submitted to the Authority with the application
Permission for retention of the following works: - (A) For renovation, alterations and extensions to existing dwelling house as built, to include minor alterations to roof pitch, dormer window and roof lights to same. (B) For retention of detached building for use as home office constructed at location of previously granted art studio, workshop and utility area Pla. Ref. No. W/98/122 (C) For retention of detached garage for use as both domestic store and boat house, (D) For waste water treatment system for use for said dwelling house. (E) For extension to the existing curtilage to property. Permission all sought to close up existing vehicular entrance and make good said boundary and for all associated site works
The development will consist of the installation of electronic communications structure comprising of a 12 metre high timber pole supporting 2 no. radio-link dishes, together with wooden post and rail fence with access gate, equipment cabinet, fibre ducting & chambers, foundation and all associated ancillary development works. The development is required to carry the broadband data from the new high speed fibre broadband network on the island, to the mainland by radio link, to connect to the NBI national fibre network, as part of the government's national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed.
The construction of a single storey dwelling with proprietary wastewater treatment system and polishing filter and associates site works
Reconstruction and erection of single storey extension to ruined dwelling and installation of septic tank and associated site development works
The construction of a 2-storey 4-bedroom dwelling and all ancillary site works. Ancillary site works to include a wastewater treatment unit, proposed new boundary fence and planting. Access to be provided from a proposed new entrance to the L-4407-26
The brief summarizes the pattern across all 245 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/5968The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief