Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 468 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A 7-year planning permission for the following Large-scale Residential Development (LRD) comprising of the construction of 212 no. residential units (comprising a mix of 2, 3 and 4 bed semi-detached and terraced houses) with 170 no. of these residential units having an option for a rear extension, 3 no. ESB substations, and all associated site development works including footpaths, car and bicycle parking, drainage, bicycle and bin stores, public lighting and landscaping/amenity areas at Knockbrogan, Bandon, Co. Cork. Access to the site will be provided via the access road onto the Cork Road permitted under reference 21/4059. An Environmental Impact Assessment Report (EIAR) has been submitted to the planning authority with the application. The Environmental Impact Assessment Report will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority. The application may be inspected online at the following website set up by the applicant: www.knockbroganlrd.ie
Permission for the construction of 95 no. residential units and all associated site development works including footpaths, car and bicycle parking, drainage, bicycle and bin stores, lighting and landscaping/amenity. Access will be provided via the access road onto the Cork Road permitted under reference 21/4059.
Permission for 8 no. 3-bedroom semi-detached dwelling houses and all ancillary site works. The proposed development is a change of house type from that permitted under An Bord Pleanala 320810-24 and Cork County Council Planning Reference 24/5216. Access to the proposed development will be provided via the Blossomhill primary estate road as previously permitted.
Permission for the construction of 1 no. detached dwelling house and all associated site works, to be serviced by site entrance, access road and site services currently under construction as permitted under Cork County Council Pl.Ref.No. 18/6293 (ABP Ref. 304806-19).
Construction of 6 no. two-storey semi-detached dwelling houses, the construction of a site entrance, connection to public mains water, connection to public foul sewer, and all associated ancillary works.
Permission for the construction of a single storey porch to the front elevation of the existing dwellinghouse and all associated site works.
The brief summarizes the pattern across all 468 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/6376The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief