Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 325 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of: The demolition of the 2 no. existing buildings and the construction of a Cable Landing Station building, an ESB substation and switch room building and all external plant consisting of a condenser compound, generators, fuel tanks, and all associated fencing and site development works.
Permission for retention of (a) existing storage building as constructed (b) site boundaries (c) additional hardstand area around existing storage building, and permission is also sought for (d) the construction of an additional storage building (e) attached canopy between existing and proposed building (f) all associated site works
Permission for Retention and Permission for Completion for the following (currently under construction) a) an increase in floor area of 55.6sqm, b) revised location of the main entrance door, c) addition of pedestrian doors to the side and rear elevations, d) revisions to elevation treatments, e) the addition of a bin service area at the rear, f) all associated site works, as permitted under the original grant of planning by Cork County Council Planning Ref. 21/316. Full Planning Permission for a change of use from permitted retail use (Planning Ref: 21/316) to use including the sale of alcohol for consumption off the premises (i.e., Off Licence use) within the overall permitted retail unit, where the floor area for the off-licence use is 14sqm and is ancillary to the primary retail use.
Construction of agricultural shed for the storage of agricultural machinery / fodder storage and all associated site works
Construction of agricultural shed containing stables and ancillary agricultural machinery / fodder storage, retention planning permission is sought for agricultural entrance to the lands and all associated site works
A change of plan from that originally permitted under planning reference 21/316 for the following development at the existing Lisavaird Co-Op facility comprising of the following a) revisions to the southern boundary comprising of an increase in the site area, b) construction of a lorry parking area for use ancillary to the co-op facility, c) the relocation southwards of the permitted vehicular entrance from the public road serving the permitted office building, d) modifications to the carparking layout serving the permitted office building, e) erection of totem signage ancillary to the permitted grocery shop and forecourt area, f) all associated site works
The brief summarizes the pattern across all 325 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/6774The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief