Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 183 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Construct a cattle house with slatted slurry tank, and construct a new roof over an existing silage yard to create a new machinery store, install a soiled water holding tank and undertake all associated site works
The construction of extensions, elevational changes, 1 no. solar panel, demolitions, and internal refurbishments to an existing dwelling, landscaping and all associated site works
Permission to install a wastewater treatment system and undertake all associated site works
Permission to construct a dwellinghouse, install a wastewater treatment system and undertake all associated site works
Permission for retention of changes to the construction of a detached building permitted under Pl Reg. No. 19/00344 consisting of: 1) Alterations to fenestration and entrance to building with reversal of living Accommodation to first floor and studio space to ground floor for use ancillary to existing dwelling, 2) Retention of adjacent shed (originally scheduled to be demolished) including new timber cladding to facade. Permission for retention is also sought for change of use of the existing garage to use as ancillary studio bedroom accommodation. Permission is sought for changes to the existing waste water treatment system including the retention of a second septic tank and associated siteworks.
Permission for the demolition of outbuilding and disused shed and for permission for construction of a detached building on the footprint of the aforementioned outbuilding to consist of living accommodation on the ground floor and an artists studio on the first floor ancillary in use to the existing dwelling and all associated site works
The brief summarizes the pattern across all 183 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 25/9The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief