Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 194 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of dwellinghouse and associated site development works
Retention of a) rooflight as constructed to front (East) elevation, b) first floor windows as constructed to South elevation, c) sun room and study as constructed to south elevation, d) garage door as constructed to front (East) elevation, e) 2 number rooflights as constructed to rear (West) elevation. Permission to construct the following a) studio space for home office use over the existing garage with external access stairs and canopy, b) conversion of dwellinghouse attic space to storage area including windows to North and South elevations, c) 6 number rooflights to rear (West) elevation, d) solar panels to south elevation, and all associated site works.
Erect a 24m high multi user lattice tower together with antennas, dishes and associated telecommunications equipment all enclosed by security fencing
To construct a cattle underpass with effluent tank and ancillary works on public road L2005
Construction of a dwelling and domestic garage
The construction of an extension to an existing dwelling house including alterations to the existing dwelling house, demolition of an existing garage, construction of a new garage, removal of an existing septic tank and installation of a new septic tank percolation area and all associated site works
The brief summarizes the pattern across all 194 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 26/0239The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief