Applications tied to the site
Partial coverage23 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
23 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 431 decisions within 5 km, 23 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
23 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
23 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a new commercial building comprising 4 individual units (2 Single-storey light industrial units with ancillary retail, one with an outdoor storage yard and 2 two-storey units for use as office space), together with new entrance from existing roadway, driveway, parking, fencing, signage and associated site works
Change of use from light industrial / commercial to commercial office.
Permission for the construction of 1) a car and van wash facility consisting of 3 no. car bays and 2 no. van bays, 2) 5 no. car valeting bays with potential for 2 no. e-charging car spaces, 3) all drainage, underground water storage tank and diesel interceptor, utility plant room, entrance and exit points, internal roadway, public lighting, landscaping, and all other necessary ancillary site development works.
To construct a new single storey internal building to accommodate offices, canteen, storage areas, toilets, laundry room and washing facilities, also undertake alterations to front elevation (to accommodate the removal of one number roller shutter door and installation of new pedestrian door) and erection of signage. Complete with all ancillary works and associated site works at our boat storage and maintenance facility.
Alterations to existing light industrial units to accommodate Inland Fisheries Ireland Youghal base. The works will involve change of use to existing light industrial/warehouse units to boat storage and maintenance facility and also contain new two-storey internal building to accommodate offices, canteen, storage areas, mezzanine storage, toilets, laundry room and washing facilities. Alterations will include the demolition of existing internal toilet, the construction of a separating wall between units no. A5-A8 and adjoining unit, alterations to front elevation, erection of signage complete with all ancillary works and associated site works.
Erection of Liquid Nitrogen Tank
The brief summarizes the pattern across all 431 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 26/0435The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief