Applications tied to the site
Partial coverage27 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
27 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 619 decisions within 5 km, 27 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
27 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
27 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Janssen Pharmaceutical Sciences Unlimited Company intends to apply to Cork County Council for full planning permission for the construction of an extension to the existing staircore by adding an additional storey to facilitate a stairs from level 3 to roof level to provide safe roof access along with the construction of a plant support platform and screening on the existing roof of the Dryer Building at the existing facility at Wallingstown, Little Island, Co. Cork. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The establishment is subject to an Integrated Pollution Prevention and a Control License and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing license condition.
The construction of a new two storey extension to the existing administration building consisting of an infill first floor within the existing building, a new stairwell to the east along with modifications to the existing north, west and east elevations with associated ancillary works at the existing facility. The facility is subject to an Integrated Pollution Prevention and a Control License.
(1) The demolition of the existing entrance canopy, (2) the construction of a new covered staff entrance with turnstiles and (3) alterations to the existing car park to construct a new HGV entrance with new barriers and associated ancillary works at their existing facility. The facility is subject to an Integrated Pollution Prevention and a Control License.
The modification of the existing process building and elevations, to include the installation of three external platforms with associated doors for plant and equipment access, the modification of an existing window, additional roof plant and equipment, and associated site works at the existing facility
Permission for the demolition of an existing 27m high boiler stack and replacement with a new 27m high stack which will cater for the existing boilers and new air heaters, a new external platform to house two number new air heaters, and associated plant, equipment and equipment enclosures and associated site works at the existing facility.
2 no. data centre buildings on a site formerly occupied by Mitsui Denman. The proposed development provides for the construction of 2 no. data centre buildings as stand alone units (to be built in phases) including ancillary offices with associated structures including a substation building, waste compound, telecoms cabinet (PoP Cabinet) new access off the R623 to provide for independent access, car park, external generator & transformer areas to the west of the proposed data centre and all ancillary works. The proposal will modify part of permission granted under 16/5011, for a data centre development changing the permitted data centre building DC3 from 1 permitted building to 2 no. buildings and associated works. Extension of Duration to Permission granted under Planning Ref. No. 17/5895 & 22/6358.
The brief summarizes the pattern across all 619 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 26/0680The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief