Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 104 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Upgrade existing septic tank with a new sewerage system and a treatment plant, to provide secondary and tertiary, and alteration to site boundary from that granted under Planning Permission Ref: 98/14231 and all associated works
Construction of a replacement dwelling, where the existing dwelling was unlawfully demolished, detached garage, entrance, connection to all mains services and all ancillary works
Construction of a storey and a half type dwelling house, alterations to existing entrance, new boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works
(a) remodelling of existing house and construction of extension to existing dwelling house; (b) demolition of existing shed and alteration to existing end shed; (c) construction of new domestic shed and (d) carry out upgrade works & alterations to access onto the public road with associated site development works
Erect an equipment storage shed to side of building and all associated works
Construct a new 50 metre by 34 metre synthetically surfaced sport pitch, erection of flood lighting, erection of sport fencing with ball stop netting and all ancillary site development works
The brief summarizes the pattern across all 104 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2273The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief