Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 287 decisions within 5 km, 3 exact-site or onsite candidate records, and 17 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
17 structured nearby appeal records.
17 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For (i) Annexes and a garage which were constructed as part of the dwelling permitted under Pl. Ref. No. 99/1403 (ii) Elevational amendments, (iii) Rooflights and dormer windows to Attic Store and all other associated site development works at
Construction of a new house, wastewater treatment system, percolation area, driveway together with all ancillary site works
Construct an extension to existing dwelling including partial demolition of existing building to facilitate changes, a domestic shed and all associated works
For a solar farm of up to 30 megawatt (mw) located at two sites in Curraghduff townland (northern parcel) and in Mothel townland (southern parcel) comprising of: photovoltaic panels on ground mounted steel frames on an area of approximately 145,000 square meters, up to 24 no. battery storage containers, up to 4 no. inverter / transformer stations, one storage container, new site access, temporary construction compound / material storage area in northern parcel; photovoltaic panels on ground mounted steel frames on an area of approximately 50,000 square meters, up to 2 no. inverter / transformer stations, one storage container, new site access and temporary construction compound / material storage area in southern parcel; and underground cables and ducts, perimeter fencing and access gates, CCTV and all ancillary development services and work. Permission sought for a period of ten years and 30 year operational life from the date of commissioning of the solar farm. A Natura Impact Statement (NIS) is submitted with the planning application
To renovate existing dwelling, alter the roof of the building, construct a dormer style extension incorporating a carport to the north of existing dwelling, garage, wastewater treatment system, percolation area, a new splayed entrance to improve the sightlines and all ancillary site works
Retention of changes to Granted Planning application 01/177. Erection of Dormer Residence, Septic Tank and Entrance, consisting of alterations to front south elevation, additional central dormer window, location & style of remaining 4 dormer windows, location of window at west elevation, omittance of double door at east elevation, related internal layout, location of chimney stack, detached carport & associated site works @ Ballyknock, Carrick on Suir, Co Waterford E32 T263
The brief summarizes the pattern across all 287 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360274The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief