Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 546 decisions within 5 km, 1 exact-site or onsite candidate record, and 23 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
23 structured nearby appeal records.
23 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DOMESTIC GARAGE (PREVIOUSLY GRANTED UNDER REF NO: 99/2366) AND ALL ASSOCIATED SITE WORKS
(1) SINGLE STOREY EXTENSION TO EXISTING SCHOOL ON EXISTING HARD SURFACE PLAYING AREA, TO ACCOMMODATE 6 NO. GENERAL CLASSROOMS AND 2 CLASSROOM AUTISM SUITE (ASD) WITH ASSOCIATED ANCILLARY SPACES AND SITE WORKS, (2) REMOVAL OF EXISTING TEMPORARY CLASSROOM ACCOMMODATION, (3) RELOCATION OF EXISTING HARD SURFACE PLAYING AREA WITH ASSOCIATED WORKS
CONSTRUCTION OF A GAS TANK COMPOUND FOR 3 NO. 4 TONNE GAS TANKS AT THE NORTH EASTERN SIDE OF THE SCHOOL GROUNDS
(1) ALTERATIONS TO THE EXISTING LIBRARY AND PASTORAL ROOM ON THE GROUND FLOOR (2) CONSTRUCTION OF A 2-STOREY EXTENSION LINKING THE EXISTING SCHOOL TO THE EXISTING GYM BUILDING. THE EXTENSION WILL CONTAIN A LARGE GENERAL PURPOSE ROOM WITH KITCHENETTE AT GROUND FLOOR LEVEL AND 1 NO. CLASSROOM, REPLACEMENT PASTORAL ROOM, REPLACEMENT LIBRARY AND TOILET FACILITIES AT FIRST FLOOR LEVEL (3) CONSTRUCTION OF A WALKWAY AND EXIT ROUTE FROM THE FIRST FLOOR LEVEL TO THE PLAYING COURTS AT THE EASTERN SIDE OF THE SITE (4) ALL SITEWORKS ASSOCIATED WITH THE AFOREMENTIONED DEVELOPMENT AND RETENTION PERMISSION FOR SMALL EXTENSION AT THE NORTHERN SIDE OF THE EXISTING BUILDING CONTAINING A PASSENGER LIFT BETWEEN LEVELS, BUILT IN 2019
1 NO PREFABRICATED CLASSROOM BLOCK, CONSISTING OF 2 NO CLASSROOMS WITH ALL ASSOCIATED SITE WORKS
EXTENSION AND ALTERATIONS TO EXISTING DWELLING HOUSE
The brief summarizes the pattern across all 546 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1951927The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief