Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 167 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development consisting of the following (1) permission for retention of sunroom extension constructed to side of dwelling house and rooflights to roof of house which differ from that granted under PL 99/626 (2) permission for retention of position of dwelling house as constructed which differs from that permitted under PL 99/626 (3) permission for retention of 2 additional vehicular entrances constructed to serve site which differ from that permitted under PL 99/626 (4) permission for retention of domestic sheds and outhouses constructed on site which differ from that permitted under PL99/626 with all associated site works
Construction of a single story rear extension, attic accommodation including rear dormer together with upgrade of existing septic tank to proprietary wastewater treatment plant and associated site works. 2) retention of velux rooflight to the front and side
Development consisting of construction of dwelling house, garage, proprietary effluent treatment unit and soil polishing filter on site, together with all ancillary site works and services
The proposed development will consist of the construction of a new slatted shed and underground slurry storage tank along with all associated site works. There will be one building and all effluent will be collected and stored in the proposed slatted tank. The slatted shed will be 7.067m in height and will be constructed on agricultural land our client & his family have been farming for generations. There is no protected structures close to the site.
Installation of a tertiary treatment system with pumped discharge to an intermittent filter unit and an 80 sq m gravel polishing filter with all associated site works
Development consisting of a replacement septic tank. The development will consist of a replacement septic tank and percolation and all necessary site ancillary site works on this site
The brief summarizes the pattern across all 167 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21502The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief