Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 290 decisions within 5 km, 3 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DEMOLITION OF THE EXISTING CO-OP BUILDING AND DISUSED ICE PLANT AND REPLACEMENT WITH A NEW BUILDING COMPRISING OF TWO STOREY OFFICE SPACE, AUCTION HALL, COLD STORAGE, FREEZERS, PACKING AREA AND ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW SINGLE-STOREY LOADING BAY WITH 2 NO. DOCK LEVELLERS, CONSTRUCTED TO THE NORTHEAST OF THE PREVIOUSLY APPROVED BUILDING GRANTED UNDER PLANNING PERMISSION REFERENCE 17/51056
ERECTION OF MANUFACTURING WORKSHOP ANCILLARY TO EXISTING ADJACENT PREMISES WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS AND CONNECTION TO ALL EXISTING SERVICES
CHANGE OF USE FROM EXISTING FISH AUCTION HALL TO MARINE VESSEL AND ANCILLARY EQUIPMENT MANUFACTURING WORKSHOP AND PERMISSION FOR CONSTRUCTION OF AN EXTENSION TO THE SIDE OF EXISTING BUILDING TO INCORPORATE ADDITIONAL WORKSHOP FLOOR SPACE WITH STORAGE FACILITIES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS AND WITH CONNECTION TO ALL EXISTING SERVICES
REMOVAL OF EXISTING BUILDING ON SITE AND ERECTION OF A NEW COMMERCIAL BUILDING TO BE USED AS A MANUFACTURING WORKSHOP ANCILLARY TO EXISTING ADJACENT PREMISES WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS AND CONNECTION TO ALL EXISTING SERVICES
CONSTRUCTION OF A TWO-STOREY EAST FACING SIDE EXTENSION TO THE EXISTING SHOP PREMISES WHICH WILL PROVIDE ADDITIONAL GROUND FLOOR CAFÉ SEATING SPACE, TOGETHER WITH FIRST FLOOR ANCILLARY OFFICE ACCOMMODATION ASSOCIATED WITH THE EXISTING SHOP
The brief summarizes the pattern across all 290 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1751056The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief