Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 242 decisions within 5 km, 1 exact-site or onsite candidate record, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
THE INSTALLATION OF A WASTEWATER TREATMENT SYSTEM, SAND POLISHING FILTER AND ASSOCIATED SITE WORKS IN LIEU OF CONNECTION TO COMMUNAL WASTE WATER TREATMENT SYSTEM APPROVED UNDER PLANNING REFERENCE NUMBERS: 06/50928, 11/40357 AND 15/51120
DEMOLITION OF AN UNINHABITABLE FIRE DAMAGED COTTAGE AND CONSTRUCTION OF A DWELLING HOUSE ON SAME SITE, REMOVAL OF EXISTING SEPTIC TANK AND INSTALLATION OF SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
GARAGE AND PERMISSION FOR CHANGE OF USE OF GARAGE TO GRANNY FLAT AND CONSTRUCTION OF EXTENSION TO SAME WITH USE OF ANCILLARY SERVICES
(1) DEMOLITION OF AN EXISTING REAR EXTENSION (2) CONSTRUCTION OF AN EXTENSION TO THE REAR OF THE EXISTING DWELLING (3) ELEVATIONAL CHANGES AND THE REFURBISHMENT OF EXISTING DWELLING (4) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM (5) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
2 NO. EXISTING EXTENSIONS WITH CONNECTION TO EXISTING SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS AND PERMISSION FOR CONSTRUCTION OF EXTENSION TO FRONT OF DWELLING HOUSE TO FORM ANCILLARY ACCOMMODATION
ERECTION OF DWELLING HOUSE AND CONNECTION TO EXISTING SEWER PUMP HOUSE AND FINAL DISCHARGE TO MAIN PUBLIC SEWER
The brief summarizes the pattern across all 242 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1751749The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief