Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 272 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF AN EXTENSION TO THE SIDE AND REAR OF EXISTING DWELLING HOUSE AND REPLACEMENT OF EXISTING FRONT DOOR OPENING WITH A WINDOW. THE PROPOSED EXTENSION WILL CONSIST OF A NEW SIDE ENTRANCE PORCH/HALLWAY LEADING TO REAR BEDROOMS WITH EN-SUITE FACILITIES
CONSTRUCTION OF EXTENSION TO EXISTING DWELLING, TOGETHER WITH RENOVATION WORKS, ELEVATIONAL ALTERATIONS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONVERSION OF ATTIC SPACE INTO HABITABLE ROOMS, ADDITIONAL FLOOR AREA AT GROUND FLOOR LEVEL AND ASSOCIATED ELEVATIONAL CHANGES TO THE REAR ELEVATION ALONG WITH CONNECTION TO EXISTING SERVICES
ERECTION OF A SINGLE STOREY STANDALONE BUILDING CONTAINING ONE MAINSTREAM CLASSROOM, ONE SET ROOM AND USER ASSISTED WC IN EXISTING SCHOOL CAMPUS AND ASSOCIATED SITE WORKS
CONSTRUCTION OF AN EXTENSION TO THE FRONT OF EXISTING DWELLING
CONSTRUCTION OF TWO-STOREY EXTENSION TO THE REAR OF EXISTING DWELLING AND ASSOCIATED WORKS
The brief summarizes the pattern across all 272 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1751865The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief