Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 156 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF AN EXTENSION TO FRONT ELEVATION OF EXISTING DWELLING AND CONNECTION TO EXISTING SEWER MAINS
CONSTRUCTION OF AN EXTENSION TO FRONT AND REAR OF AN EXISTING DWELLING
(A) DEMOLITION OF EXISTING DISUSED OUTSHED AND (B) ERECTION OF COMMERCIAL STORAGE SHED
(1) DECOMMISSIONING OF THE EXISTING WASTEWATER TREATMENT PLANT STRUCTURES ADJACENT TO ST BRIDGET'S TERRACE, KERRYKEEL, (2) CONSTRUCTION OF A REPLACEMENT WASTEWATER TREATMENT PLANT ON THE SAME SITE COMPRISING STORM AND SLUDGE HOLDING TANKS, INLET PUMPING STATION, 1 NO. PRIMARY SETTLEMENT TANK, INLET SCREENING, 2 NO. ROTATING BIOLOGICAL CONTACTORS, 2 NO. FINAL SETTLEMENT TANKS, FERRIC DOSING UNIT, CONTROL KIOSK, ODOUR CONTROL UNIT, 1 NO. TOILET BLOCK, LIGHTING COLUMNS, TELEMETRY AERIAL, 2.4M HIGH BOUNDARY FENCE AND ANCILLARY WORKS, ACCESS VIA THE EXISTING SITE ENTRANCE, (3) CONSTRUCTION OF A NEW WASTEWATER PUMPING STATION AT A SITE ON MAIN STREET, KERRYKEEL COMPRISING AN UNDERGROUND STORAGE TANK, CONTROL KIOSKS, LIGHTING COLUMN, TELEMETRY AERIAL, 1.2M HIGH SITE BOUNDARY WALL AND FENCING, NEW ACCESS TO THE R246 PUBLIC ROAD, LANDSCAPING AND ANCILLARY WORK, (4) 470M OF TRANSFER PIPEWORK AND ANCILLARY WORKS FROM THE WASTEWATER PUMPING STATION TO THE WASTEWATER TREATMENT PLANT ALONG THE PUBLIC ROADS R246, R247 AND L-5412-1 AND (5) 86M OF PIPEWORK AND ANCILLARY WORKS FROM THE WASTEWATER TREATMENT PLANT TO THE DISCHARGE LOCATION ON THE BURNSIDE RIVER
DEMOLITION OF EXISTING DWELLING HOUSE AND GARAGE AND ERECTION OF A REPLACEMENT DWELLING HOUSE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
CHANGE OF DESIGN OF 3 NO. GLAMPING PODS AND REPOSITIONING OF SITE BOUNDARY FROM THAT PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 24/61733
The brief summarizes the pattern across all 156 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1850273The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief