Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 206 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF NEW DWELLING HOUSE WITH ASSOCIATED WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN EXTENSION TO THE SIDE OF EXISTING SHED TO CREATE AN OPEN FRONTED STORAGE AREA AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
EXISTING SHUTTERED WALL AND PERMISSION FOR CONSTRUCTION OF A NEW GARAGE/STORAGE SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF (A) TWO BROILER HOUSES AND (B) BUILDING CONTAINING OFFICE, CANTEEN, TOILET AND STORE AND (2) INSTALLATION OF TREATMENT PLANT AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF (A) TWO BROILER HOUSES (B) BUILDING CONTAINING OFFICE CANTEEN, TOILET AND STORE AND (C) TREATMENT PLANT A PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS PLANNING APPLICATION
CONSTRUCTION OF A DWELLING WITH EFFLUENT TREATMENT PLANT, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 206 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1850279The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief