Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 188 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, GARAGE, WASTE TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
(1) CONSTRUCTION OF NEW AGRICULTURAL/MACHINERY SHED (2) RETENTION OF EXISTING STONE LANEWAY AND DRAINAGE PIPES/OPEN DRAIN
RETENTION & COMPLETION OF A RETAINING WALL, DETACHED GARAGE AND STORE AND ASSOCIATED SITE DEVELOPMENT WORKS.
CONSTRUCTION OF EXTENSION AND RENOVATION WORKS TO EXISTING DWELLING HOUSE AND DEVELOPMENT OF A SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
THE FLARE, PROCESS SUMP, WASHDOWN AREA,CO2 COMPRESSION BUILDING, 2 NO. CO2 TANKS AND WEIGHBRIDGE WHICH ARE IN LIEU OF THOSE APPROVED UNDER 14/51399. A BOILER HOUSE, CARBOSCAN CONTAINER, 2 NO. FURTHER CO2 TANKS, SECURITY HUT AT THE WEIGHTBRIDGE, A CONTROLS BUILDING, 3 NO. DIGESTATE DISPATCH TANK, 2 NO. TRANSFORMERS, ODUR CONTROL UNIT, OFFICE EXTENSION, EXTENSION TO THE NORTH -EAST CORNER OF THE YARD AND CLOSURE OF THE INTERNAL ROAD LINKING THE BIOGAS FACILITY TO THE WIDER GLENMORE ESTATE AT THE SOUTH EASTERN CORNER OF THE SITEAND ALL ASSOCIATED SITE WORKS ON LANDS ACCESSED OFF THE ADJOINING REGIONAL ROAD R-253-1 ASSOCIATED WITH GLENMORE ESTATES BIOGAS FACILITY
The brief summarizes the pattern across all 188 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1850341The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief