Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
MOVILLE COMMUNITY COLLEGE CARROWNAFF , MOVILLE , LIFFORD P.O.Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

MOVILLE COMMUNITY COLLEGE CARROWNAFF , MOVILLE , LIFFORD P.O.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

6% of nearby decided applications were refused. The site check found 263 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.

Matched source
1850394
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

3 matched

Zoning and settlement

Not yet covered

No zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.

Rural-housing policy

Confirmed coverage

One current citation from the Donegal County Council development plan, with section, page and source URL.

1 matched

Flood, heritage, ecology and archaeology

Partial coverage

2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.

2 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

3 structured nearby appeal records.

3 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.

1 matched
263Nearby applications
3Site-linked candidates
6%Nearby refused
3Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

1850394

ERECTION OF ONE NO. TEMPORARY CLASSROOM CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS

Granted0.0 km03 May 2018
2050601

(1) REMOVAL OF ALL EXISTING TEMPORARY SCHOOL BUILDINGS, INCLUDING FOUNDATIONS AND DEMOLITION OF ANY RELATED ELEMENTS (2) CONSTRUCTION OF A NEW PERMANENT 2 STOREY POST PRIMARY SCHOOL BUILDING FOR MOVILLE COMMUNITY COLLEGE (5,274.7 SQ M GROSS FLOOR AREA) WITH ASSOCIATED EXTERNAL SIGNAGE TO INCLUDE (A) 10 NO. GENERAL CLASSROOMS, 8 NO SPECIALIST TEACHING ROOMS, 2 NO. SPECIAL NEEDS CLASSROOMS WITHIN A SPECIAL EDUCATIONAL NEEDS SUITE, PE HALL AND ASSOCIATED PE ANCILLARY ACCOMODATION, STAFF ROOM, ADMINSTRATION ROOMS, TOILETS, STORES AND A DOUBLE HEIGHT GENERAL PURPOSE ROOM WITH ASSOCIATED KITCHEN AND STORE (B) AN ENCLOSED FIRST FLOOR LINK CORRIDOR TO THE EXISTING 2 STOREY SCHOOL BUILDING (C) EXTERNAL COVERED AREA AND EXTERNAL CONSTRUCTION STUDIES STORE (D) SITE DEVELOPMENT WORKS INCLUDING REVISIONS TO VEHICULAR / PEDESTRIAN PARKING WITH NEW BUS DROP-OFF ZONES INCLUDING 54 NO. ADDITIONAL STANDARD CAR PARKING SPACES, 5 NO. UNIVERSALLY ACCESSIBLE PARKING SPACES AND 4 NO. BUS SPACES (E) TEMPORARY / EMERGENCY VEHICULAR ACCESS ONTO THE NORTHERN BOUNDARY (F) 3 NO. ADDITIONAL BALL COURTS (G) DIVERSION OF EXISTING ESB POWER LINES AND STORM DRAINAGE, PROVISION OF STORM ATTENUATION, A NEW WASTE WATER TREATMENT PLANT, HARD AND SOFT LANDSCAPING, GRASSED PLAY SPACE, OUTER ACTIVITY COURT, SEN GARDEN / PLAY SPACE, ASSOCIATED SITE DEVELOPMENT AND SERVICE INFRASTRUCTURE WORKS

Granted0.0 km05 November 2020
1950970

CONSTRUCTION OF A DOMESTIC GARAGE

Granted0.2 km08 August 2019
2050336

ERECTION OF A DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS

Granted0.2 km18 June 2020
2562187

RENOVATION AND CONSTRUCTION OF EXTENSION TO EXISTING DWELLING TOGETHER WITH ALL ASSOCIATED WORKS INCLUDING DEMOLITIONS AND CONNECTION TO EXISTING SERVICES

Granted0.2 km30 January 2026
2461870

(1) REMOVAL OF EXISTING KITCHEN WINDOW ON THE FRONT SOUTHEAST ELEVATION OF THE DWELLING HOUSE AND REPLACEMENT WITH NEW SLIDING PATIO DOORS AND (2) CONSTRUCTION OF NEW PATIO FRENCH DOORS ON NORTHEAST FACING GABLE LIVING ROOM WALL OF DWELLING

Granted0.3 km09 January 2025

The brief summarizes the pattern across all 263 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required