Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 299 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
SÍNEADH A CHUIR LEIS AN SEOMRA FEISTÍS ATÁ ANSIN CHEANNA FHÉIN, ÚASGHRADÚ A DHÉANAMH AR AN PAIRC TRAENÁLA, SCONSA DÉ TRÍ MEADAIR AR AIRDE A CHUIR TIMPEALL AN PAIRC TRAENÁLA, COMHARTHAÍ ÚRA AGUS OIBREACHA SUÍOMH A DHÉANAMH
SÍNEADH A CHUIR LEIS AN SEOMRA FEISTÍS ATÁ ANSIN CHEANNA FHÉIN, ÚASGHRADÚ A DHÉANAMH AR AN PAIRC TRAENÁLA, SCONSA DÉ TRÍ MEADAIR AR AIRDE A CHUIR TIMPEALL AN PAIRC TRAENÁLA, COMHARTHAÍ ÚRA AGUS OIBREACHA SUÍOMH A DHÉANAMH
INSTALLATION OF A 12-METRE STOUT WOODEN UTILITY POLE WITH 1 NO. RECEIVING DISH, A GROUND-LEVEL DUAL BAY CABINET, PALISADE FENCING TO MATCH EXISTING GATE FENCING, CONCRETE PLINTH AND ALL OTHER ASSOCIATED DEVELOPMENT. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF A TWO-STOREY DWELLING HOUSE, WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF A FIRST FLOOR EXTENSION, (2) ALTERATIONS TO FENESTRATIONS, (3) CHANGE OF USE OF EXISTING STORE ROOM INTO WET-ROOM AND ENSUITE ROOM, (4) REPLACEMENT ROOF TO EXISTING STORE ROOM AND (5) ALL ASSOCIATED SITE DEVELOPMENT WORKS
A DWELLING HOUSE AND SEPTIC TANK SYSTEM
The brief summarizes the pattern across all 299 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1850397The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief