Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 222 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) INTENSIFICATION, CONTINUATION AND EXTENSION OF QUARRY OPERATIONS (2) EXTENSION OF EXISTING BLOCK CONCRETE STORAGE YARD AREA (3) ERECTION OF WATER FILTRATION PLANT, WATER STORAGE TANK & ASSOCIATED PUMPS. (4) REMOVAL OF EXISTING SEPTIC TANK AND INSTALLATION OF REPLACEMENT ENVIROCARE WASTEWATER TREATMENT SYSTEM
EXISTING SHED AND PERMISSION FOR (1) THE RECYCLING OF INERT CONSTRUCTION & DEMOLITION WASTE AND MUNICIPAL WASTE (2) DEVELOPMENT OF A CONCRETE YARD (3) ERECTION OF A SECURITY FENCING & BERMS ALONG SITE BOUNDARIES (4) CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKS INCLUDING SEDIMENT SETTLEMENT TANK AND HYDROCARBON INTERCEPTOR
(1) RETENTION OF EXISTING SHED FOR RECYCLING OF WASTE MATERIALS AND (2) RECYCLING OF INERT CONSTRUCTION & DEMOLITION WASTE AND MUNCIPAL WASTE, (B) A NEW CONCRETE YARD, (C) ERECTION OF SECURITY FENCING & BERMS ALONG SITE BOUNDARIES, (D) CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKS INCLUDING SEDIMENT SETTLEMENT TANK AND HYDROCABON INTERCEPTOR. THIS DEVELOPMENT WILL REQUIRE A WASTE FACILITY PERMIT UNDER THE WASTE MANAGEMENT (FACILITY PERMIT AND REGISTRATION) REGULATIONS S.I. NO:821 OF 2007 AND THE WASTE MANAGEMENT (FACILITY PERMIT AND REGISTRATION) AMENDED REGULATIONS S.I. 86 OF 2008
CONSTRUCTION OF A SHED TOGETHER WITH ALL ASSOCIATED WORKS
(A) DEMOLITION OF PART DWELLING HOUSE (B) PROVISION OF AN EXTENSION AND RENOVATIONS TO DWELLING HOUSE (C) DEMOLITION OF SHED ATTACHED TO EXISTING OUTBUILDING (D) CONSTRUCTION OF A DETACHED PRIVATE SHED TOGETHER WITH ALL ASSOCIATED WORKS
DEMOLITION OF A PREVIOUSLY EXISTING SINGLE STOREY SHED AND PERMISSION FOR CONSTRUCTION OF A NEW REPLACEMENT SINGLE STOREY SHED
The brief summarizes the pattern across all 222 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1850503The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief