Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 425 decisions within 5 km, 1 exact-site or onsite candidate record, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DWELLING HOUSE WITH SEPTIC TANK
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A PART SINGLE STOREY, PART ONE AND A HALF STOREY DWELLING HOUSE WITH ATTACHED DOMESTIC GARAGE, A SEWAGE TREATMENT SYSTEM, ACCESS LANE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A TWO STOREY DWELLINGHOUSE, AN ON-SITE EFFLUENT TREATMENT SYSTEM, NEW SITE ENTRANCE OFF A PRIVATE LANE WITH ALL ASSOCIATED SITE WORKS AND ANCILLARY DEVELOPMENTS
ERECTION OF 3 NO. DWELLING HOUSES INCLUDING THE REMOVAL OF EXISTING PARTIALLY BUILT HOUSES WITH CONNECTION TO THE PUBLIC SEWER VIA THE EXISTING ONSITE PROPRIETARY WASTE WATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
(1) COMPLETION OF ONE NUMBER PARTIALLY BUILT HOUSE (PREVIOUSLY GRANTED UNDER PLANNING REF NO: 05/2374 (2) DEMOLITION OF EXISTING SUB FLOOR BASE (3) ERECTION OF TWO NUMBER NEW HOUSES AND CONNECTION TO THE PUBLIC SEWER VIA THE EXISTING ON-SITE PROPRIETARY WASTE WATER TREATMENT SYSTEM INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 425 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1850642The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief