Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 147 decisions within 5 km, 8 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RENOVATION AND EXTENSION OF EXISTING DWELLING HOUSE. DECOMMISSIONING OF THE EXISTING SEPTIC TANK AND INSTALLATION OF A NEW SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
RENOVATION AND EXTENSION TO EXISTING DWELLING HOUSE WITH PROPOSED UPGRADING WORKS TO THE EXISTING SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A DOMESTIC SHED FOR STORAGE OF MACHINERY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) SINGLE-STOREY EXTENSION BUILT TO THE WEST GABLE OF EXISTING DWELLING HOUSE (2) DETACHED DOMESTIC GARAGE BUILT IN LIEU OF AN ATTACHED GARAGE AND (3) ASSOCIATED SITE DEVELOPMENT WORKS TO THAT GRANTED PLANNING PERMISSION UNDER PLANNING REF. NO. 07/30863
(1) RETENTION OF EXCAVATED FILL MATERIAL (2) CHANGE OF USE FROM CO-OP SHOP TO DOMESTIC DWELLING (3) PROVISION OF AN EXTENSION & ELEVATIONAL AMENDMENTS TO ALL FACADES (4) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF A NEW TREATMENT SYSTEM AND (5) ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF EXISTING HOTEL AND THE DECOMMISSIONING OF THE ON-SITE TREATMENT SYSTEM THAT CURRENTLY SERVES THE EXISTING HOTEL AND 6 NO. EXISTING DWELLINGS, (2) CONSTRUCTION OF A NEW HOTEL WITH ASSOCIATED CAR PARKING FACILITY AND THE INSTALLATION OF A NEW SEWAGE TREATMENT SYSTEM THAT WILL SERVE BOTH THE NEW HOTEL AND THE 6 NO. EXISTING DWELLINGS, (3) ERECTION OF ASSOCIATED SIGNAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
The brief summarizes the pattern across all 147 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1850658The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief