Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 264 decisions within 5 km, 5 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
CHANGE OF USE FOR THE GROUND FLOOR OF THE 'HARBOUR BUILDING' BURTONPORT FROM COMMUNITY-BASED SERVICE USE (GRANTED UNDER REF. NO. 17/50710) TO A HEALTH CARE CENTRE
(1) REFURBISHMENT OF EXISTING SHOP UNIT AND PROVISION OF COFFEE/TEA ROOMS TO THE GROUND FLOOR, (2) CHANGE OF USE OF FIRST FLOOR & ATTIC ROOMS FROM A BEDROOM ACCOMMODATION TO 3 NO. TWO BEDROOM APARTMENTS AND 1 NO. ONE BEDROOM APARTMENT, (3) PROVISION OF A NEW ENCLOSED STAIRWAY AT THE REAR OF THE BUILDING TO SERVE THE FIRST FLOOR, (4) PROVISION OF FOUR ROOF DORMERS/WINDOWS TO THE ROOF TO SERVE THE ATTIC ROOF SPACE AND (5) UPGRADING OF ALL EXISTING SERVICES AND EXISTING PARKING AREA WITH ALL ASSOCIATED SITE WORKS TO BUILDING KNOWN AS CAMPBELLS PIER HOUSE
ENCLOSING OF EXISTING PATIO AREA AT THE HARBOUR CAFÉ WITH FLAT ROOF AND GLAZED FRAME STRUCTURE
(1) DEMOLITION OF EXISTING BLOCKWORK WALLS AND CONSTUCTION OF A WASTEWATER PUMPING STATION (WWPS) WITH APPROXIMATELY 19M3 STORAGE, (2) CONSTRUCTION OF A WASTEWATER TREATMENT PLANT (WWTP) AND A NEW VEHICULAR ACCESS ON TO THE L-5983 ROAD. THE WWTP WILL PROVIDE PRIMARY TREATMENT FOR 300 POPULATION EQUIVALENT (PE), (3) INSTALLATION OF ASSOCIATED GRAVITY SEWERS, FLUSHING SYSTEM, RISING MAINS AND EXTENSION OF THE EXISTING SEWER WITH INCREASED DIAMETER AND (4) ASSOCIATED ANCILLARY WORKS TO THE WWPS AND WWTP ALONG THE R260 & L-5983 ROADS
CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
CONVERSION OF PART OF FORMER COMMERCIAL BUILDING (THE OLD COPE SHOP) INTO OFFICE SPACE AND PART INTO A TWO BEDROOM APARTMENT, MAINTAIN ALL EXISTING SERVICES WITH PARKING AND ALL NECESSARY SITE WORKS
The brief summarizes the pattern across all 264 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 1850662The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief