Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 1,201 decisions within 5 km, 2 exact-site or onsite candidate records, and 64 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
64 structured nearby appeal records.
64 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF AN OFFICE BUILDING WITH STAFF WELFARE AND CANTEEN FACILITIES WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF ADVERTISING STRUCTURES AND SIGNAGE ON THE NORTH WEST AND SOUTH WEST ELEVATIONS OF THE BUILDING AND A STANDALONE ADVERTISING STRUCTURE LOCATED AT THE NORTH WEST CORNER OF THE SITE WITH A SIGN FACING SOUTH WEST
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE EAST OF THE EXISTING SCHOOL COMPRISING OF A NEW CLASSROOM, 2 SET ROOMS AND ASSOCIATED ACCOMMODATION AND INTERNAL ALTERATIONS TO THE EXISTING LAYOUT AND ALTERATIONS TO EXISTING WINDOWS TO THE SOUTH AND EAST ELEVATIONS OF THE SCHOOL AND DEMOLITION AND REMOVAL OF THE TEMPORARY PORTACABIN OFF SITE AND CONNECTION TO ON-SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A TEMPORARY NEW PREFABRICATED CLASSROOM BLOCK TO CONSIST OF 2 NO. 80 M2 CLASSROOMS AND 2 NO. SET ROOMS WITH CONNECTION TO ON-SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
INSTALLATION OF HIGH-POWER ELECTRIC VEHICLE CHARGING POINTS AND ASSOCIATED INFRASTRUCTURE CONSISTING OF THE FOLLOWING: (1) INSTALLATION OF 8 NO. ELECTRIC VEHICLE CHARGING BAYS WITH 8 NO. TESLA ILLUMINATED CHARGING UNITS AND ASSOCIATED SIGNAGE, (2) INSTALLATION OF PROPOSED TESLA SUPERCHARGER POWER CABINET EQUIPMENT, (3) INSTALLATION OF PROPOSED MODULAR SUBSTATION, (4) ERECTION OF ASSOCIATED EV SIGNAGE AND (5) ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING SURFACING, LIGHTING AND LINE MARKING
ERECTION OF A DRIVE THROUGH CAFÉ, ALTERATIONS TO THE EXISTING ROAD LAYOUT, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 1,201 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1850692The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief