Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 284 decisions within 5 km, 5 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) RETENTION OF AN EXISTING ATTIC CONVERSION AND GROUND FLOOR LINK BETWEEN EXISTING DWELLING & EXISTING DOMESTIC GARAGE AND (2) ERECTION OF SINGLE STOREY EXTENSIONS TO THE FRONT AND WESTERN ELEVATIONS OF EXISTING DWELLING HOUSE
(1) DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM (2) INSTALLATION OF A NEW SEPTIC TANK AND PERCOLATION AREA TO SERVE EXISTING DWELLING HOUSE
(A) DEMOLITION OF EXISTING UNINHABITABLE DWELLING HOUSE AND (B) ERECTION OF NEW GARDEN/HOBBY ROOM ANCILLARY TO THE USE OF THE MAIN DWELLING
CONSTRUCTION OF A NEW DOMESTIC DWELLING INCORPORATING EXISTING STRUCTURES ON SITE, AN ONSITE TREATMENT SYSTEM CONSISTING OF A MECHANICAL AERATION WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
UPGRADING OF THE EXISTING SEPTIC TANK SYSTEM BY THE ADDITION OF A SECONDARY TREATMENT TANK AND TERITARY WETLAND
RETENTION AND COMPLETION OF THE CONSTRUCTION OF TWO EXTENSIONS TO THE REAR OF THE EXISTING HOTEL BUILDING TO PROVIDE ADDITIONAL STORAGE / SERVICES AND STAFF FACILITIES
The brief summarizes the pattern across all 284 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1850876The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief