Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 270 decisions within 5 km, 1 exact-site or onsite candidate record, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
REMOVAL OF EXISTING REAR EXTENSION AND ERECTION OF DOMESTIC EXTENSION TO THE FRONT AND REAR OF THE EXISTING DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A ONE AND A HALF STOREY DWELLING HOUSE WITH PREPARATORY WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A STEEL PORTAL SHED FOR STORAGE AND ALL ASSOCIATED SITE WORKS
10 YEAR PLANNING PERMISSION WHICH WILL CONSIST OF (1) UPGRADING OF APPROXIMATELY 0.7KM OF EXISTING ACCESS TRACK AND EXISTING SITE ENTRANCE, (2) CONSTRUCTION OF APPROXIMATELY 1.2KM OF NEW ACCESS TRACKS AND NEW SITE ENTRANCE, AND (3) CONSTRUCTION OF A 5.5M SPAN TEMPORARY BRIDGE AND ASSOCIATED ANCILLARY INFRASTRUCTURE
CONSTRUCTION OF A NEW DWELLING HOUSE WITH SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A LIGHT INDUSTRIAL BUILDING TO FACILITATE PROCESSING AND STORAGE OF WOOD PELLETS, TO FACILITATE THE DECARBONISATION OF PRODUCTION REFRIGERATION SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 270 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1851010The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief