Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 308 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DEMOLITION OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF A NEW TWO STORIED DWELLING HOUSE WITH MECHANICAL AERATION SYSTEM AND SOIL POLISHING FILTER, DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS
(1) NEW SITE ENTRANCE ONTO COUNTY ROAD L-1645-5 TO SERVE THE EXISTING DWELLING, (2) DECOMMISSIONING OF EXISTING SEPTIC TANK AND PERCOLATION AREA, (3) INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM/POLISHING FILTER AND (4) ALL ASSOCIATED SITE DEVELOPMENT WORKS, INCLUDING CONNECTION TO ONSITE SERVICES
ERECTION OF A DOMESTIC GARAGE TO SERVICE EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF NEW ESB SUBSTATION TO FRONT OF EXISTING FACTORY BUILDING (2) ELEVATIONAL CHANGES TO FRONT FACADE GRANTED UNDER PLANNING REF: 17/50313 (3) ALL ASSOCIATED SITE WORKS
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
INSTALLATION OF A TOTAL OF 341 NO. SOLAR PANEL ACROSS THE 3NO. SOUTH FACING ROOFS OF FACTORY PREMISES INCLUDING CONNECTION TO EXISTING ESB SUB-STATION WITHIN THE BUILDING (EACH SOLAR PANEL MEASURES 1.84M HIGH X 1.03 WIDE)
The brief summarizes the pattern across all 308 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1851239The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief