Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 303 decisions within 5 km, 8 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
TEACH CÓNAITHE, GARÁISTE, AGUS LÁNCHÓRAS CÓIREÁLA LE HAONAD SCAG-GHLANTA ITHREACH A THÓGÁIL AGUS BEALACH ROCHTANA AN IARRATAIS A CHEANGAL DEN BHEALACH ROCHTAN ATÁ ANN FAOI LÁTHAIR ÓN N56
LE TEACH CÓNAITHE, GARÁISTE, & LÁNCHÓRAS CÓIREÁLA LE HAONAD SCAG-GHLANTA ITHREACH A THÓGÁIL AGUS BEALACH ROCHTANA AN IARRATAIS A CHEANGAL DEN BHEALACH ROCHTANA ATA ANN FAOI LÁTHAIR ÓN N56
LE TEACH CÓNAITHE, GARÁISTE, DABHACH SÉARACHAIS AGUS BEALACH ROCHTANA A THÓGÁIL AGUS AN BEALACH ROCHTANA A CHEANGAL LEIS AN BHEALACH ROCHTANA ATÁ ANN FAOI LÁTHAIR ÓN N56
AN FOBAIRT ATÁ BEARTHAITHE AGAINN NÓ: TEACH CÓNAITHE NUA A THÓGÁIL. CÓRAS CÓIREÁLA SÉARACHAIS A THÓGÁIL, CHOM MAITH LE HOIBREACHA SUÍMH A DHÉANAMH
(A) CONSTRUCTION OF AN INTERNAL QUARRY HAUL ROUTE ON LANDS OUTSIDE OF THE PERMITTED QUARRY BOUNDARY AT THE NORTH OF THE QUARRY OVER AN AREA OF 0.07 HA (B) EXTENSION OF THE QUARRY FLOOR BY 0.058 HA TO FACILITATE THE INTERNAL QUARRY HAUL ROUTE (C) RELOCATION OF THE PERIMETER EMBANKMENT TO THE NORTH OF (A) AND (B) ABOVE EXTENDING OVER AN AREA OF 0.232 HA ON A TOTAL SITE OF 0.725 HA
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 303 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1851245The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief