Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 111 decisions within 5 km, 3 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) RETENTION OF EXISTING DWELLING AND ACCESS ARRANGEMENTS, (2) EXTENSION/RENOVATION OF EXISTING DWELLING, AND (3) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION/CONNECTION TO NEW WASTEWATER TREATMENT SYSTEM AND INFILTRATION AREA
(1) DEMOLITION OF EXISTING DISUSED 160 SQ.M. CHILL STORE (2) ERECTION OF A PROPOSED CLEANER FISH HATCHERY BUILDING ON THE SITE OF THE FORMER CHILL. THE PROPOSED HATCHERY WILL CONSIST OF A 520 SQ.M. PORTAL FRAMED BUILDING WITH A RIDGE HEIGHT OF APPROXIMATELY 4.90M ABOVE THE EXISTING PAVED YARD. THE BUILDING WILL BE FINISHED WITH PROFILED SHEETING, COLOURED GREEN. (3) CONNECTION TO THE EXISTING SEA WATER INTAKE SYSTEM AND UNDERGROUND ELECTRIC POWER SUPPLY (4) INSTALLATION OF A FILTER AND 100 CU.M. SEA WATER HEADER TANK WITH UNDERGROUND GRAVITY PIPEWORK CONNECTION TO NEW HATCHERY (5) INSTALLATION OF WASTE WATER COLLECTION SYSTEM AND PUMPED RISING MAIN WITH FILTRATION UNIT TO THE EXISTING SEA WATER OUTFALL PIPE AT THE NEARBY KINDRUM SMOLT FARM (6) ALL ASSOCIATED SITE SERVICES
SINGLE STOREY DETACHED DOMESTIC GARAGE, LOCATED TO THE REAR OF THE EXISTING DWELLING, TOGETHER WITH ALL ASSOCIATED SITE WORKS
CONVERSION OF ATTIC AND INTEGRAL GARAGE TO HABITABLE ACCOMMODATION INCLUDING ASSOCIATED SITE WORKS
ERECTION OF A SLATTED SHEEP SHED WITH ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING HOUSE WITH AN ON-SITE WASTE WATER TREATMENT SYSTEM
The brief summarizes the pattern across all 111 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1851428The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief