Applications tied to the site
Partial coverage14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 179 decisions within 5 km, 14 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
WORKS TO BE CARRIED OUT TO EXISTING RESIDENTIAL DWELLING HOUSE FOR PROVISION OF 2 NO. TWO BEDROOM APARTMENTS, WORKS INCLUDE REMOVAL OF EXISTING SINGLE STOREY EXTENSION TO THE REAR AND PROVISION OF A NEW TWO STOREY EXTENSION TO THE REAR AND ALL INTERNAL RENOVATION AND ANCILLARY SITE DEVELOPMENT WORKS
A PETROL FILLING STATION CONSISTING OF A PREFABRICATED SHOP AND ANCILLARY ACCOMMODATION INCLUDING TOILETS, DRY FUEL STORES, PARKING AREA, CANOPY AND PUMPS, LORRY FILLING POINT, UNDERGROUND STORAGE TANKS, ASSOCIATED SIGNAGE AND ALL ASSOCIATED SITE WORKS
(1) AMENDMENTS TO CONDITION NO'S. 5(A), 6(A), 6(B) AND 6(C) OF PLANNING PERMISSION REF NO. 19/50881, (2) AMENDMENTS TO CONDITION NO. 4(B), 4(C) AND 8(A) OF PLANNING PERMISSION REF NO. 20/52024, AND (3) ERECTION OF A CAR WASH FACILITY
(1) REMOVAL OF EXISTING TEMPORARY SHOP UNIT (2) ERECTION OF BUILDING CONTAINING SHOP, DELICATESSEN, DINING AREA, STORE AND ALL ASSOCIATED USES (3) CONSTRUCTION OF AN ADDITIONAL PUMP ISLAND FOR H.G.V'S (4) UPGRADING OF EXISTING ONSITE SEWERAGE TREATMENT SYSTEM PRIOR TO CONNECTION TO PUBLIC SEWER AND ALL OTHER ASSOCIATED SITE WORKS
(1) ERECTION OF AN ACOUSTIC FENCE ON TOP OF EXISTING 2-METER-HIGH CONCRETE BLOCK WALL, MAXIMUM HEIGHT OF 3.6 METERS ON WESTERN BOUNDARY OF EXISTING PETROL FILLING STATION IN ACCORDANCE WITH SERIES NG 300 – FENCING AND ENVIRONMENTAL NOISE BARRIERS (TII PUBLICATIONS) AND (2) EXTENSION OF OPENING TIME TO 24 HOURS FOR THE DELIVERY OF FUEL
(1) ERECTION OF AN ACOUSTIC FENCE ON TOP OF EXISTING 2-METER-HIGH CONCRETE BLOCK WALL, MAXIMUM HEIGHT OF 3.6 METERS ON WESTERN BOUNDARY OF EXISTING PETROL FILLING STATION IN ACCORDANCE WITH SERIES NG 300 - FENCING AND ENVIRONMENTAL NOISE BARRIERS (TII PUBLICATIONS) AND (2) EXTENSION OF OPENING TIME TO 24 HOURS FOR THE DELIVERY OF FUEL
The brief summarizes the pattern across all 179 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1851437The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief