Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 311 decisions within 5 km, 2 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A SUNROOM EXTENSION TO DWELLING & SAFETY BARRIER RAILINGS ON GARAGE ROOF
(1) DEMOLITION OF EXISTING DWELLING, DOMESTIC GARAGE AND DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM (2) ERECTION OF A NEW DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF A SINGLE-STOREY DWELLING HOUSE, ANCILLARY DOMESTIC GARAGE AND LEAN TO COVERED AREA, (2) INSTALLATION OF A NEW SEWERAGE TREATMENT UNIT AND PERCOLATION AREA AND (3) CONSTRUCTION OF A NEW ENTRANCE ONTO THE ADJOINING ROADWAY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) REFURBISHMENT (2) ERECTION OF (A) AN EXTENSION AND ALTERATIONS TO AN EXISTING DISUSED HOUSE/ COTTAGE TO INCLUDE REFURBISHMENT OF THE EXISTING COTTAGE (B) A NEW GLAZED PORCH AND (C) A SINGLE STOREY FLAT ROOF EXTENSION TO THE SIDE AND REAR TO PROVIDE AN ADDITIONAL HALLWAY BEDROOM, BATHROOMS AND ANCILLARY SPACES (3) INSTALLATION OF A NEW SEWERAGE TREATMENT UNIT AND PERCOLATION AREA AND ALL ASSOCIATED SERVICES AND SITE DEVELOPMENT WORKS AND UPGRADING OF THE EXISTING ENTRANCE TO THE PUBLIC ROAD
CONSTRUCTION OF 1 NO. SINGLE STOREY DWELLING WITH MECHANICAL AERATION TANK AND WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED WORKS
CONSTRUCTION OF 1 NO. 1 & 1/2 STOREY DWELLING WITH MECHANICAL AERATION TANK AND WASTE WATER TREATMENT SYSTEM WITH ALL ASSOCIATED WORKS
The brief summarizes the pattern across all 311 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1851707The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief