Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 106 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A TEN-YEAR PLANNING PERMISSION FOR A WIND FARM WITH A 30-YEAR OPERATIONAL LIFE (FROM THE DATE OF COMMISSIONING) CONSISTING OF (A) UP TO 7 NO. WIND TURBINES WITH A TIP HEIGHT OF UP TO 150 METRES AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS, (B) 1 NO. ON-SITE ELECTRICAL SUB-STATION, (C) 1 NO. TEMPORARY CONSTRUCTION COMPOUND, (D) 1 NO. ANEMOMETRY MAST WITH A HEIGHT OF UP TO 100 METRES, (E) RECREATIONAL AMENITY TRAIL AND ASSOCIATED SIGNAGE, PARKING AND RECREATIONAL FACILITIES, (F) ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING CONNECTING THE TURBINES TO THE PROPOSED ON-SITE SUBSTATION, (G) UPGRADING OF EXISTING ACCESS TRACKS AND PROVISION OF ANY NEW SITE ACCESS ROADS REQUIRED INCLUDING NEW SITE ACCESS ONTO THE LOCAL ROAD NETWORK IN THE TOWNLAND OF TULLYHORKY AND ASSOCIATED DRAINAGE, (H) EXCAVATION OF 1 NO. BORROW PIT AND (I) ALL ASSOCIATED SITE DEVELOPMENT WORKS (INCLUDING TREE FEELING). AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN SUBMITTED
(A) DEMOLITION OF EXISTING FOOTINGS AND FOUNDATIONS OF DWELLING HOUSE DESTROYED BY FIRE & FOR CONSTRUCTION OF REPLACEMENT DWELLING HOUSE ON PORTION OF EXISTING FOOTPRINT (B) ERECTION OF A SINGLE STOREY DOMESTIC GARAGE (C) DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF A SECONDARY AND TERTIARY TREATMENT SYSTEM AND DISCHARGE TO A DISPOSAL/DISTRIBUTION PAD AND ALTERATION AND WIDENING OF EXISTING SITE ENTRANCE ONTO THE PUBLIC ROAD, INCLUSIVE OF ALL ASSOCIATED SITE WORKS
ERECTION OF A DWELLING HOUSE AND INSTALLATION OF A SEPTIC TANK, REED BED AND TERTIARY WETLAND AREA
(1) A 38KV UNDERGROUND CABLE GRID CONNECTION APPROXIMATELY 9KM IN LENGTH FROM THE CONSENTED DERRYKILLEW COMMUNITY WIND FARM (AN BORD PLEANÁLA REF. NO. 307520, DONEGAL COUNTY COUNCIL REF. NO. 19/51750) TO LANDS AT TOWNPARKS, NORTH OF THE EXISTING CATHALEEN'S FALL 110KV SUBSTATION IN BALLYSHANNON, (2) A PARTIAL SECTION OF A 38KV OVERHEAD LINE GRID CONNECTION CROSSING 130M OVER THE RIVER ERNE AT CATHALEEN'S FALL, BALLYSHANNON, AND (3) THE DERRYKILLEW COMMUNITY WIND FARM 38KV SUBSTATION AND A BATTERY ENERGY STORAGE SYSTEM. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ACCOMPANIES THIS APPLICATION
(1) ERECTION OF A MACHINERY SHED AND (2) UPGRADE OF EXISTING SEPTIC TANK SYSTEM IN EXISTING BUILDERS YARD
ERECTION OF DWELLING HOUSE SERVICED BY EFFLUENT TREATMENT SYSTEM AND POILISHING FILTER & ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 106 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1851741The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief