Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 235 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF A NEW DOMESTIC GARAGE, A SUNROOM EXTENSION TO EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
DOMESTIC GARAGE AS CONSTRUCTED INCORPORATING 2 BEDROOMS AT FIRST FLOOR LEVEL WHICH ARE ANCILLARY TO THE DWELLING HOUSE AND WITH CONNECTION TO THE EXISTING WASTEWATER TREATMENT SYSTEM AND PERMISSION FOR CONSTRUCTION OF AN ENTRANCE DOOR ON THE EASTERN ELEVATION OF THE GARAGE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF EXISTING RUINS TO FACILITATE THE SITE ENTRANCE AND (2) CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A SINGLE DWELLING, PRIVATE GARAGE, WASTE WATER TREATMENT SYSTEM, CONNECTION TO PUBLIC WATER SYSTEM, ENTRANCE AND ALL OTHER ANCILLARY SITE WORKS
EXTENSIONS TO EXISTING DWELLING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A NEW DWELLING HOUSE AND INSTALLATION OF A WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED DRAINAGE AND SITE WORKS
The brief summarizes the pattern across all 235 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1851770The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief