Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 294 decisions within 5 km, 4 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DEMOLITION OF EXISTING SHED (MACHINE SHOP), CONSTRUCTION OF A NEW BUILDING, STORAGE AREA ASSOCIATED WITH EXISTING RETAIL OUTLET AND NEW MACHINE SHOP ASSOCIATED WITH EXISTING BOAT YARD, CONNECTION TO EXISTING ON-SITE SERVICES WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
ALTERATIONS AND CHANGE OF USE OF PART OF THE FRONT OF THE EXISTING SHOP TO PROVIDE A COFFEE DOCK FOR SALE OF FOOD AND BEVERAGES, WITH INTERNAL AND EXTERNAL SERVERY HATCHES AND PROVISION OF INTERNAL AND EXTERNAL SEATING TO INCLUDE PROVISION OF OPENINGS IN THE FRONT ELEVATION AND ELEVATION CHANGES
DEMOLITION OF A SECTION OF THE EXISTING SEA WALL IN COMBINATION WITH THE CONSTRUCTION OF A NEW ROCK ARMOUR REVETMENT AND A NEW BOUNDARY FENCE ON THE SOUTH-EAST OF THE EXISTING BOAT YARD FACILITY
CONSTRUCTION OF (1) A BESPOKE STATE OF THE ART PASSENGER BERTH TAILORED TO ACCOMMODATE PASSENGER VESSELS AND (2) ADDITIONAL SMALL CRAFT HARBOUR BERTHS ADJACENT TO THE PASSENGER BERTH TO SUPPLEMENT THE EXISTING SMALL CRAFT HARBOUR LOCATED NORTH OF THE BLACKROCK PIER. THE PROPOSED SITE FOR THE PASSENGER PONTOON AND ADDITIONAL BERTHS IS LOCATED BETWEEN BLACKROCK PIER AND MOONEY BOATS LTD PREMISES IN THE BLACKROCK BASIN
CONSTRUCTION OF A NEW PLANT AND SUPPLIES STORAGE BUILDING FOR THE DEPARTMENT OF AGRICULTURE, FOOD AND THE MARINE
(1) CONSTRUCTION OF A NEW 2-STOREY OFFICE BUILDING WITH ANCILLARY FACILITIES, ASSOCIATED SITE WORKS AND NEW PHOTOVOLTAIC PANEL INSTALLATION ON THE ROOF AND (2) ERECTION OF A NEW SCULPTURAL ART PIECE ON SITE
The brief summarizes the pattern across all 294 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1851817The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief