Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 94 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A NEW SINGLE STOREY DWELLING WITH SEPTIC TANK/TREATMENT PLANT AND PERCOLATION AREA ALONG WITH ASSOCIATED SITEWORKS AND CONNECTION TO SERVICES
(1) DEMOLITION OF THE EXISTING DWELLING HOUSE DUE TO DEFECTIVE CONCRETE BLOCKWORK GRANTED UNDER PLANNING PERMISSION REF. 99/4278 AND (2) ERECTION OF A REPLACEMENT DWELLING TO BE CONNECTED TO THE EXISTING PREVIOUSLY APPROVED EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A NEW SILAGE PIT WITH ASSOCIATED EFFLUENT RUN-OFF TANK
(A)CHANGE OF USE FROM DWELLING TO 4NO. APARTMENTS, (B) CHANGE OF USE FROM GARAGE TO 1 NO.APARTMENT, (C) CONSTRUCTION OF DORMERS AND PLANNING PERMISSION FOR THE INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA
(A) CHANGE OF USE OF ROOF SPACE TO PROVIDE FIRST FLOOR ACCOMMODATION AND (B) GROUND FLOOR REAR AND SIDE EXTENSIONS
CONSTRUCTION OF A MACHINERY STORAGE SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 94 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1950017The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief