Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 141 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) RETENTION OF EXISTING DWELLING HOUSE AND ASSOCIATED SITEWORKS AND (2) EXTENSION TO EXISTING DWELLING AND CONSTRUCTION OF A PERCOLATION AREA TO SERVE EXISTING SEPTIC TANK
ERECTION OF A DWELLING WITH WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED WORKS
REPLACEMENT OF AN EXISTING 30M-HIGH RADIO MAST AND CABLE STAY SUPPORTS WITH A PROPOSED 30M-HIGH LATTICE TOWER TO SUPPORT 4NO. RADIO-LINK DISHES, TOGETHER WITH EQUIPMENT CABINET AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS INCLUDING UPGRADING OF ACCESS TRACK AT EXISTING RADIO MAST SITE. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED
CONSTRUCTION OF A DWELLING HOUSE WITH A DOMESTIC GARAGE AND SEPTIC TANK SYSTEM TOGETHER WITH ALL ASSOCIATED SITE WORKS AND DRAINAGE
ERECTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
ERECTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 141 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1950035The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief