Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 88 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A 6MW BATTERY ENERGY STORAGE SYSTEM (BESS) PROVIDED WITHIN A COMPOUND AREA CONSISTING OF ASSOCIATED PLANT, EQUIPMENT AND BUILDINGS INCLUDING: 2 NO. BESS CONTAINER BUILDINGS OF 2.6M IN HEIGHT, 12.2M IN LENGTH AND 2.5M IN WIDTH, 2 NO. TRANSFORMERS (EQUIPMENT) OF 2.5M IN HEIGHT, 2M IN LENGTH AND 2M IN WIDTH; A GRP SWITCHGEAR KIOSK (PLANT) OF 4.1M IN HEIGHT, 5.5M IN LENGTH AND 5.5M IN WIDTH; COMPOUND MESH FENCE OF 2.75M IN HEIGHT; AREA OF HARDSTANDING; 50M UNDERGROUND CABLE CONNECTING THE DEVELOPMENT TO THE EXISTING WINDFARM SUBSTATION; AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS TO FACILITATE THE DEVELOPMENT. ACCESS TO THE SITE WILL BE VIA THE EXISTING BARNESMORE WINDFARM PRIVATE LANEWAY WHICH ACCESSES ONTO THE LOCAL ROAD (L20151-1) WITHIN THE EXISTING BARNESMORE WINDFARM SITE
UPGRADING OF EXISTING INFRASTRUCTURE INCLUDING A GRP TRANSFORMER ENCLOSURE HOUSING TRANSFORMER EQUIPMENT, TRANSFORMER PLINTH AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS TO FACILITATE THE DEVELOPMENT. THE PROPOSED TRANSFORMER ENCLOSURE WILL BE 2 METRES IN HEIGHT, 3.55 METRES IN LENGTH AND 2.44 METRES IN WIDTH. THE TRANSFORMER ENCLOSURE WILL BE LOCATED ON A NEW TRANSFORMER CONCRETE PLINTH ON THE EXISTING WIND TURBINE HARD STAND AREA. DUCTING WILL BE INSTALLED BETWEEN THE PROPOSED PLINTH AND THE EXISTING TURBINE
DEVELOPMENT OF A MODULAR BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY FOR A PERIOD OF 10 YEARS CONSISTING OF UP TO 27 NO. BATTERY STORAGE MODULES (UP TO 14M LENGTH, 2.44M WIDE AND 2.9M HIGH) AND ANCILLARY EQUIPMENT INCLUDING UP TO 27 NO. TRANSFORMERS (UP TO 2.5M LENGTH, 2.5M WIDE AND 2.9M HIGH), 27 NO. POWER CONDITIONING UNIT BLOCK AREAS (UP TO 8.0M LENGTH, 1.5M WIDE AND 2.3M HIGH), 27 NO. SWITCHGEAR UNITS (UP TO 1.5M LENGTH, 1.5M WIDE AND 2.2M HIGH), SUBSTATION CONTAINER (UP TO 4.5M LENGTH, 4.5M WIDE AND 3.0M HIGH); INTERNAL PERMEABLE ACCESS ROAD JOINING THE FACILITY WITH THE EXISTING MEENADREEN WIND FARM ROAD NETWORK AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS, INCLUDING FENCING, DRAINAGE AND UNDERGROUND ELECTRICAL CONNECTIONS, REQUIRED TO FACILITATE THE DEVELOPMENT AND USE OF EXISTING ACCESS ARRANGEMENTS. A NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION
70-METRE-HIGH TEMPORARY METEROLOGICAL MAST AND ALL ASSOCIATED WORKS FOR A PERIOD OF 3 YEARS
A 70 METRE HIGH TEMPORARY METEOROLOGICAL MAST AND ALL ASSOCIATED WORKS FOR A PERIOD OF 21 MONTHS WITHIN THE EXISTING BARNESMORE WINDFARM SITE
CONSTRUCTION OF A DWELLING HOUSE WITH INTEGRAL GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 88 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1950357The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief