Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 489 decisions within 5 km, 3 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
DETACHED DOMESTIC GARAGE AND PERMISSION FOR CONSTRUCTION OF (1) EXTENSIONS TO THE SIDE AND REAR OF EXISTING DWELLING HOUSE, PROPOSED WORKS SHALL INCLUDE PROVISION OF ROOF WINDOW AND ELEVATIONAL AMENDMENTS TO EXISTING DWELLING HOUSE (2) A GAMES ROOM / HOME OFFICE SPACE AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE WITH INTEGRAL GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) RETENTION OF (A) DORMER WINDOWS TO REAR ELEVATION OF EXISTING DWELLING HOUSE (WHICH IS THE SUBJECT OF DEMOLITION HEREIN) (B) DETACHED DOMESTIC GARAGE WITH ATTACHED STORAGE SHED, (C) DETACHED GARDEN STORAGE SHED AND (D) VEHICULAR ENTRANCE AND (2) DEMOLITION OF EXISTING DWELLING HOUSE CONSTRUCTED WITH DEFECTIVE CONCRETE BLOCKWORK AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 489 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1950359The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief