Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 162 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A NEW FARM YARD CONSISTING OF (A) MEAL STORE, (B) 2 NO. SILAGE PITS, (C) SLATTED AGRICULTURAL SHED AND HANDLING FACILITIES AND (D) ACCESS VIA A NEW ENTRANCE AND ACCESS ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
SURFACING OF EXISTING ACCESS ROAD WITH A HARD SURFACE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CHANGE OF USE OF EXISTING DOMESTIC GARAGE TO HAIR AND BEAUTY SALON CONSISTING OF CHANGES FROM A GARAGE DOOR TO A PEDESTRIAN DOOR AND WINDOW WITH CONNECTION TO EXISTING PUBLIC SEWER ALONG WITH ALL ASSOCIATED SITE WORKS
DEVELOPMENT OF A NEW SEWERAGE PUMPING STATION, RISING MAIN AND GRAVITY SEWER CONSISTING OF: (A) TYPICAL UNDERGROUND STORAGE CHAMBER/TANK, (B) ABOVE GROUND CONTROL KIOSK, MOTOR CONTROL CENTRE (MCC) KIOSK AND WASH WATER KIOSK, (C) TELEMETRY POLE (MAXIMUM 6M IN HEIGHT), (D) PERIMETER PALADIN FENCING (2.4M IN HEIGHT), (E) ACCESS ROAD (4M WIDE) AND INTERNAL VEHICULAR TURNING AREA, (F) WET WELL CHAMBER (27M³), (G) PASSIVE ACTIVATED CARBON FILTERS OVER THE WET WELL CHAMBER FOR VENTILATION, (H) RISING MAIN (APPROXIMATELY 160M IN LENGTH), (I) INLET SEWER, (J) EMERGENCY STORAGE AND OVERFLOW, INCLUDING A NEW HEADWALL AT ST. JOHNSTON STREAM, (K) INLET, WET WELL, VALVE CHAMBERS, AND METER CHAMBER, (L) LIGHTING AND WELFARE FACILITIES. THE PROPOSED DEVELOPMENT WILL SPAN AN AREA OF APPROXIMATELY 2216M2. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
DWELLING HOUSE CONSTRUCTED DIFFERENTLY TO THAT PREVIOUSLY APPROVED APPLICATION REF: 08/70716, TOGETHER WITH ALL ASSOCIATED WORKS
ERECTION OF DWELLING HOUSE WITH SEPTIC TANK, PERCOLATION AREA AND DETACHED DOMESTIC OFFICE & STORE
The brief summarizes the pattern across all 162 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1950452The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief