Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 55 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A PORTAL FRAMED SHEEP SHED, WITH STORAGE TANK BELOW AND, INTEGRAL PENNING, CONCRETE APRON INCLUDING ALL ASSOCIATED SITEWORKS
CONSTRUCTION OF A PORTAL FRAMED CATTLE SHED, STORAGE TANK BELOW, CONCRETE APRON AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A PORTAL FRAMED MACHINERY AND DRY FEED STORE, CONCRETE APRON AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A PORTAL FRAMED SHEEP HOUSE, SLATTED TANK BELOW, CONCRETE APRON AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A PORTAL FRAMED DRY BEDDED CATTLE SHED, CONCRETE APRON AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A PORTAL FRAMED SHEEP SHED, WITH STORAGE TANKS BELOW, MACHINERY SHED, SILAGE PIT WITH CONCRETE APRON AND STORM WATER SOAKAWAYS TO INCLUDE ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 55 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1950502The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief