Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 1,014 decisions within 5 km, 3 exact-site or onsite candidate records, and 59 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
59 structured nearby appeal records.
59 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCTION OF A NEW SINGLE STOREY PITCHED ROOF EXTENSION TO THE REAR (NORTH) OF EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW STOREY AND A HALF PITCHED ROOF EXTENSION TO THE REAR (NORTH) OF EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS
REVISIONS TO PREVIOUSLY APPROVED PLANNING REF. NO'S. 06/80149 AND 18/51993 TO INCLUDE: (1) CHANGE OF HOUSE TYPE ON SITE NO'S 26,27,35 & 36, (2) REVISIONS TO APARTMENT NO'S 1 TO 8 TO INCLUDE RAISING OF FLOOR LEVELS, REVISIONS TO SERVICE ROAD, REVISED ENTRANCE LOCATION & ASSOCIATED SITE WORKS SERVING APARTMENT NO'S 1 TO 8
REVISIONS TO PREVIOUSLY APPROVED PLANNING REF. NO. 06/80149 AND EXTENDED UNDER PLANNING REF. NO'S 12/80073 & 17/51689: (1) REVISIONS TO PART OF INTERNAL SITE LAYOUT AND ALL ASSOCIATED SITE WORKS TO INCLUDE UPGRADING/REALIGNMENT OF KNOCKANAR ROAD AND CONNECTION TO EXISTING PUBLIC SEWER, (2) OMISSION OF 94 NO. RESIDENTIAL UNITS PREVIOUSLY APPROVED AND CONSTRUCTION OF 72 NO. DWELLINGS AND 16 NO. APARTMENTS (TOTAL NO. 88 RESIDENTIAL UNITS). RELOCATION OF CRÉCHE AND ASSOCIATED SITE WORKS
REVISIONS TO PREVIOUSLY APPROVED PLANNING REF. NO. 06/80149 AND EXTENDED UNDER PLANNING REF. NO'S 12/80073, 17/51689 & 21/52009: (1) REVISIONS TO PART OF INTERNAL SITE LAYOUT AND ALL ASSOCIATED SITE WORKS TO INCLUDE UPGRADING/REALIGNMENT OF KNOCKANAR ROAD AND CONNECTION TO EXISTING PUBLIC SEWER, (2) OMISSION OF 94 NO. RESIDENTIAL UNITS PREVIOUSLY APPROVED AND CONSTRUCTION OF 72 NO. DWELLINGS AND 16 NO. APARTMENTS (TOTAL NO. 88 RESIDENTIAL UNITS). RELOCATION OF CRÉCHE AND ASSOCIATED SITE WORKS
REVISIONS TO PREVIOUSLY APPROVED PLANNING REF. NO'S. 06/80149 AND 18/51993 TO INCLUDE (1) CHANGE OF HOUSE TYPE ON SITE NO'S 26,27,35 & 36; (2) REVISIONS TO APARTMENT NO'S 1 TO 8 TO INCLUDE RAISING OF FLOOR LEVELS, REVISIONS TO SERVICE ROAD, REVISED ENTRANCE LOCATION & ASSOCIATED SITE WORKS SERVING APARTMENT NO'S 1 TO 8
The brief summarizes the pattern across all 1,014 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 1950656The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief