Applications tied to the site
Partial coverage13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 320 decisions within 5 km, 13 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
(1) RETENTION OF (A) EXISTING TAKEAWAY AS CONSTRUCTED INCLUDING CHANGES TO THE ELEVATIONS & PROVISION OF EXTRACT DUCTING TO COOKING AREA (B) CHANGES TO EXISTING DWELLING HOUSE AS CONSTRUCTED INCLUDING THE DEMOLITION OF TWO STOREY STRUCTURE PREVIOUSLY LOCATED TO THE SIDE OF EXISTING PROPERTY (C) STORAGE SHED LOCATED TO THE REAR OF TAKEAWAY AS CONSTRUCTED (D) VEHICULAR ACCESSWAY TO SERVE EXISTING DWELLING, & (E) GAS TANK LOCATED IN THE REAR GARDEN OF EXISTING PROPERTY & (2) RETENTION & COMPLETION OF DOMESTIC GARAGE LOCATED TO THE REAR OF EXISTING PROPERTY & ALL ANCILLARY SITE WORKS
(1) CONSTRUCTION OF EXTENSION TO THE REAR OF THE EXISTING BUILDING TO PROVIDE 3 NO. 2 BEDROOM APARTMENTS, (2) ASSOCIATED BIN STORAGE AREA SERVING THE ENTIRE DEVELOPMENT, (3) REMOVAL OF EXISTING STORAGE AREA AND GARAGE TO REAR OF BUILDING TO ALLOW FOR THE NEW EXTENSION AND (4) NEW CONNECTION TO EXISTING PUBLIC SEWER FROM THE DEVELOPMENT AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
DEMOLITION OF DERELICT TOWN HALL AND ERECTION OF AN APARTMENT BLOCK CONSISTING OF 4 NO. 1-BED APARTMENTS OVER 2 FLOORS, CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKS
DEMOLITION OF THE DERELICT TOWN HALL AND ERECTION OF AN APARTMENT BLOCK CONSISTING OF 6 NO. 2-BED APARTMENTS OVER 3 FLOORS, CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKS
(1) CHANGE OF USE FROM A RESIDENTIAL DWELLING TO 3 NO. APARTMENTS (2) RAISING THE ROOF LEVEL OF EXISTING BUILDING, CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKS
(1) INSTALLATION OF A NEW SHOP FRONT TO EXISTING PUBLIC HOUSE (2) INSTALLATION OF A RAMPED ACCESS AND HANDRAILS TO THE SIDE OF EXISTING PUBLIC HOUSE (3) SINGLE STOREY EXTENSION TO THE SIDE OF EXISTING PUBLIC HOUSE (4) CREATION OF A RAISED PLATFORM IN THE REAR GARDEN AND CREATION OF AN UNCOVERED TIMBER DECKED BEER GARDEN / EXTERNAL SEATING AREA (5) ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 320 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 1950792The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief