Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 9 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF CONCRETE BASE FOR A SILAGE PIT AND PLANNING PERMISSION FOR THE ERECTION OF CONCRETE WALLS ON THE SAID CONCRETE BASE TO FORM A SILAGE PIT AND ALL ASSOCIATED SITE WORKS
RENOVATION AND CONSTRUCTION OF EXTENSION TO EXISTING DERELICT DWELLING AND INSTALLATION OF PACKAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
(1) CONSTRUCTION OF A GALVANISED STEEL TRUSS WEATHER RADAR TOWER WITH A TECHNICAL EQUIPMENT ROOM, A RADOME LOCATED AT THE TOP AND AN EQUIPMENT ROOM LOCATED AT THE BASE. A SECTION OF FORESTRY WILL BE FELLED TO FACILITATE THE STRUCTURE, WHICH WILL MEASURE A TOTAL OF 30M IN HEIGHT AND 8M IN DIAMETER AND WILL BE LOCATED ON A HARDCORE PLATFORM. ACCESS TO THE STRUCTURE WILL BE VIA A NEW ACCESS ROAD OFF THE EXISTING FOREST HAUL ROAD WHICH WILL BE UPGRADED TO A WIDTH OF 3.8M WHERE REQUIRED, (2) INSTALLATION OF A SOLAR PHOTOVOLTAIC (PV) ARRAY CONSISTING OF 24 SOLAR PANELS ON A FIXED GROUND-MOUNTED FRAME, BOUNDARY TREATMENT TO DEFINE THE SITE AND SECURE THE WEATHER RADAR AND ALL ASSOCIATED SITE WORKS AND SERVICES
CONSTRUCTION OF TWO PORTAL FRAMED SHEDS TO INCLUDE (1) THREE BY TWO BAY OPEN FRONT CATTLE SHED, OVER AND INCLUDING UNDERGROUND STORAGE TANK AND (2) THREE BY THREE BAY ENCLOSED SHEEP SHED, OVER AND INCLUDING UNDERGROUND STORAGE TANK, INCLUDING ALL ASSOCIATED SITE WORKS
REPLACEMENT SEPTIC TANK AND PERMISSION FOR CONSTRUCTION OF EXTENSION AND IMPROVEMENTS TO TWO STOREY DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS AND LANDSCAPING
CONSTRUCTION OF A DWELLING HOUSE WITH EFFLUENT TREATMENT SYSTEM AND POLISHING FILTER
The brief summarizes the pattern across all 9 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1951008The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief