Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 171 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
REPOSITIONING AND CHANGE OF DESIGN OF DWELLING HOUSE AND GARAGE PREVIOUSLY APPROVED UNDER PLANNING REF: 11/20273 AND EXTENSION OF DURATION REF 16/51313 AND ASSOCIATED DEVELOPMENT WORKS
RETENTION AND COMPLETION OF A DWELLING HOUSE AND DETACHED DOMESTIC GARAGE (PLANNING PERMISSION REF. NO. 19/51103 REFERS) AND ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A DWELLING HOUSE, DOMESTIC GARAGE, BORED WELL AND INSTALLATION OF AN EFFLUENT TREATMENT SYSTEM AND SOIL POLISHING FILTER. A NATURA IMPACT STATEMENT HAS BEEN SUBMITTED WITH THIS APPLICATION
(1) CONSTRUCTION OF A NEW SPA AND WELLNESS FACILITY CONSISTING OF A SINGLE STOREY BUILDING CONTAINING A GYM, STUDIO, SAUNA, STEAM ROOM, CHANGING ROOMS AND SUPPORT AREAS ALONG WITH AN EXTERNAL DECK INCORPORATING A HYDROTHERAPY POOL AND TWO HOT TUBS, (2) CONSTRUCTION OF THREE INDIVIDUAL TREATMENT CABINS WITH PRIVATE HOT TUBS AND (3) ALL ASSOCIATED LANDSCAPING AND SERVICES. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
(1) CONSTRUCTION OF AN ADDITIONAL THREE NEW BEDROOMS IN LIEU OF EXISTING ADMINISTRATION AREAS AT FIRST FLOOR DORMER LEVEL WITHIN THE EXISTING HOTEL RECEPTION BLOCK, ALONG WITH ASSOCIATED MODIFICATIONS AT GROUND FLOOR LEVEL TO FACILITATE ACCESS AND CONSTRUCTION OF 3 NEW DORMER WINDOWS, (2) CONVERSION OF EXISTING STORE AREAS WITHIN THE LOWER GROUND FLOOR LEVEL IN THE MAIN BEDROOM BLOCK TO ADMINISTRATIVE OFFICES AND BACK OF HOUSE SUPPORT, ALONG WITH ASSOCIATED MODIFICATIONS TO EXISTING WINDOW OPENINGS, (3) CONVERSION OF AN EXISTING STOREROOM WITHIN THE LOWER GROUND LEVEL IN THE MAIN BEDROOM BLOCK TO A FRONT OF HOUSE GUEST SCREENING ROOM, ALONG WITH A NEW LIFT BETWEEN THE LOWER GROUND FLOOR LEVEL AND GROUND FLOOR LEVEL AND (4) CONSTRUCTION OF AN OVERFLOW PARKING AREA, INCLUDING AN ADDITIONAL 26 CAR PARKING SPACES, ALONG WITH ALL ASSOCIATED LANDSCAPING AND SERVICES
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 171 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1951103The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief