Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 203 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
MODIFICATIONS TO THE WATER TREATMENT PLANT DEVELOPMENT PERMITTED UNDER PLANNING PERMISSION REFERENCE 15/51355 INVOLVING (1) SITE LAYOUT CHANGES INCLUDING REDUCTION IN ROAD AND HARDSTANDING AREAS, REPOSITIONING OF THE ON-SITE WASTEWATER TREATMENT UNIT, REPOSITIONING OF GENERATOR HOUSING AND EXTERNAL OIL TANK, OMISSION OF GENERATOR SHED ENCLOSURE AND REVISED PARKING LAYOUT; (2) REDUCTION IN THE FOOTPRINT OF THE WATER TREATMENT PLANT BUILDING AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING; (3) REDUCTION IN THE FOOTPRINT OF THE SLUDGE DEWATERING BUILDING AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING; (4) REDUCTION TO THE RAW WATER BALANCING TANK HEIGHT, INCLUDING OMISSION OF OUTLET CHAMBERS; (5) MODIFICATIONS TO THE CLEAR WATER TANK, INCLUDING REDUCING THE TANK DEPTH, REDUCTION IN FOOT PRINT, AND RAISING THE ROOF LEVEL OF THE TANK BY 1.48M (6) REPOSITIONING OF, AND ALTERATIONS TO, THE SLUDGE TREATMENT FACILITIES INCLUDING; INCREASING THE NUMBER OF TANKS FROM 6 TO 8, REPLACING THE SINGLE WASH WATER RECOVERY TANK WITH TWO CIRCULAR WASH WATER RECOVERY TANKS AND INSTALLATION OF AN ADDITIONAL UNDERGROUND STORAGE TANK (PROCESS WATER SUMP) (38.5 M2); (7) ALL SITE WORKS ASSOCIATED WITH CHANGES TO DEVELOPMENT
DEMOLITION OF EXISTING DERELICT HOUSE AND ERECTION OF NEW REPLACEMENT DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM
EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE AND UPGRADING OF EXISTING SEPTIC TANK SYSTEM
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE
ERECTION OF A NEW DWELLING HOUSE AND DOMESTIC GARAGE WITH SEWAGE TREATMENT SYSTEM INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND A DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 203 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1951216The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief