6% of nearby decided applications were refused. The site check found 316 decisions within 5 km, 7 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CEAD LE MEADÚ A CHUIR LENAR TEACH CONAÍ MARAON LE OIBREACHA SUIOMH
MEADÚ A CHUIR LENAR GCONAÍ REATHA MAR AON LE NA H-OIBREACHA SUIOMH CAOÍ
CONSTRUCTION OF 27 NO. NEW 2-STOREY TERRACED AND SEMI-DETACHED DWELLINGS (2 NO. 4-BEDROOM DWELLINGS, 18 NO. 3-BEDROOM DWELLINGS AND 7 NO. 2-BEDROOM DWELLINGS), ALONG WITH NEW WASTEWATER TREATMENT PLANT CONNECTED TO MAINS DRAINAGE SYSTEM, CONNECTION TO EXISTING SERVICES AND ASSOCIATED SITE WORKS
CONSTRUCTION OF (1) A 4-BEDROOM COMMUNITY GROUP HOME, (2) 26 NO. DWELLING HOUSES CONSISTING OF 10 NO. 3-BEDROOM DWELLINGS AND 16 NO. 2-BEDROOM DWELLINGS, (3) PROPOSED ACCESS ROAD, FOOTPATHS, AND PUBLIC LIGHTING FACILITIES TO SERVICE THE PROPOSED DEVELOPMENT, (4) PROPOSED PUBLIC OPEN SPACE AMENITIES INCLUDING THE PROVISION OF CAR PARKING FACILITIES TO SERVE THE PROPOSED DEVELOPMENT, (5) A FOUL SEWER INCLUDING EFFLUENT TREATMENT PLANT AND RISING MAIN TO CONNECT TO EXISTING PUBLIC FOUL SEWER NETWORK, (6) A STORM WATER SEWER NETWORK AND WATERMAINS TO SERVE THE PROPOSED DEVELOPMENT, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ALTERATIONS TO THE APPROVED PLANNING PERMISSION REF. NO. 19/51090 WHICH INCLUDES THE FOLLOWING: (1) PROVISION OF 5 ADDITIONAL 2 BEDROOM DWELLING HOUSES, (2) PROVISION OF A 5 BEDROOM GROUP HOME, (3) ALTERATIONS TO THE DEVELOPMENT LAYOUT WHICH INCLUDES THE DWELLING LAYOUTS, INTERNAL ACCESS ROAD, CAR PARKING, FOOTPATHS AND OPEN SPACE ARRANGEMENTS TO CATER FOR PROPOSED NEW AMENDMENTS, (4) ALTERATIONS TO THE SITE SERVICES TO CATER FOR PROPOSED NEW AMENDMENTS, (5) ALTERATIONS TO THE SITE BOUNDARIES AND RELOCATION OF PROPOSED PUMPING STATION AND (6) ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF 21 NO. DWELLINGS ALONG WITH NEW WASTEWATER TREATMENT PLANT CONNECTED TO MAINS DRAINAGE SYSTEM, CONNECTION TO EXISTING SERVICES AND ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 316 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1951310The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.