Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 179 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1) MINOR UPGRADE WORKS ASSOCIATED WITH THE EXISTING TERMINAL WASTEWATER PUMPING STATION (WWPS). THIS WILL INCLUDE BASE MAINTENANCE UPGRADES AND FLOOD RISK REMEDITATION WORKS COMPRISING OF AN INCREASE TO THE EXISTING BOUNDARY WALL HEIGHT TO 3.86M OD AND NEW 1.1M HIGH FLOOD GATE; 2) CONSTRUCTION OF A WASTEWATER TREATMENT PLANT (WWTP) AND CONNECTION TO EXISTING SEWER. THE WWTP WILL PROVIDE PRIMARY TREATMENT FOR 1,796 POPULATION EQUIVALENT (PE); 3) CONSTRUCTION OF A MOUNDED BERM 1.3M IN HEIGHT TO THE NORTH AND WEST OF THE WWTP SITE; 4) CONSTRUCTION OF A NEW ACCESS LANE TO THE WWTP; 5) INSTALLATION OF ASSOCIATED RISING MAIN AND GRAVITY SEWER; 6) WIDENING AND RESURFACING OF EXISTING ACCESS LANEWAY FROM THE WWPS TO THE WWTP INCLUDING 2NO. PASSING BAYS, 1NO. SPEED RAMP AND NEW GATE; AND 7) ALL ASSOCIATED PLANTING AND ANCILLARY SITE WORKS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AS PART OF THIS APPLICATOIN.
CONSTRUCTION OF A SINGLE STOREY SIDE EXTENSION TO DWELLING
CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO PUBLIC SEWER
CONSTRUCTION OF A DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS
EXTENSIONS AND MODIFICATIONS TO EXISTING HOUSE TO INCLUDE GROUND FLOOR EXTENSION TO FRONT SIDE AND REAR SIDE OF HOUSE, CONVERSION OF EXISTING ATTIC SPACE TO LIVING ACCOMMODATION INCLUDING NEW ROOF PROJECTION, INTERNAL RECONFIGURATION WORKS, ELEVATIONAL CHANGES, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A DOMESTIC EXTENSION TO THE GABLE END OF EXISTING DWELLING HOUSE AND FRONT PORCH TOGETHER WITH ALL ASSOCIATED SITE DEVEOPMENT WORKS
The brief summarizes the pattern across all 179 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1951898The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief