Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,228 decisions within 5 km, 1 exact-site or onsite candidate record, and 64 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
64 structured nearby appeal records.
64 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A PART TWO STOREY, PART THREE STOREY, COMMUNITY NURSING UNIT/RESIDENTIAL CARE UNIT (9,400SQM TOTAL GROSS FLOOR AREA). THE BUILDING COMPRISES OF 110 BEDS FOR A MIX OF LONG STAY, SHORT STAY/REHABILITATION AND DEMENTIA USES WITH ASSOCIATED RESIDENT ACCOMMODATION INCLUDING DINING ROOMS, KITCHENETTES, RESIDENT AREAS WITH FAMILY OVERNIGHT ROOM, VISITOR'S ROOM, TREATMENT ROOMS, HAIRDRESSER'S SALON; REHABILITATION ROOMS; INTERNAL COURTYARD AND TERRACE SPACES; BACK OF HOUSE AREAS INCLUDING KITCHEN AND LAUNDRY ROOMS, STAFF ACCOMMODATION AND ANCILLARY OFFICES AND NEW ENTRANCE FROM KILMACRENNAN ROAD; HARD AND SOFT LANDSCAPING; SERVICE YARD (THE TOTAL GROSS FLOOR AREA OF SERVICE BUILDINGS IS 74SQM AND INCLUDES WASTE STORAGE AREA, STAFF AREAS AND ESB SWITCH ROOM AND SUB STATION); AND ALL ASSOCIATED SITE AND DEVELOPMENT WORKS
9 NO. EXISTING PREFABRICATED BUILDING UNITS
ERECTION OF A PRE-FABRICATED PORTACABIN TO PROVIDE A CLASSROOM AND AN OFFICE INCLUDING STORE ROOMS, WET AREAS AND WC AND CONNECTION INTO EXISTING PUBLIC SEWER
ALTERATIONS AND CONSTRUCTION OF AN EXTENSION TO EXISTING DWELLING HOUSE
(1) CONSTRUCTION OF (A) A SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING CDM HUB BUILDING (B) ADDITIONAL CAR PARKING SPACES (C) NEW STEPS AND RAMP ACCESS FROM LOWER CAR PARK (D) EXTERNAL BIN STORE (2) DEMOLITION OF AN EXISTING OUTBUILDING (3) RELOCATION OF EXISTING OIL TANK AND ALL ASSOCIATED WORKS AND SITE WORKS INCLUDING CONNECTION TO EXISTING FOUL AND STORM DRAINAGE
DEVELOPMENT OF A NEW GAS STORAGE COMPOUND WITH ASSOCIATED TANKS, HARD-STANDING TO ACCOMMODATE ACCESS BY ARTICULATED LORRY, PROPOSED RC WALLS AND SECURITY FENCING, PROPOSED CIVIL WORKS INCLUDING ATTENUATION TANK AND HYDROCARBON INTERCEPTOR ASSOCIATED WITH THE HARDSTANDING AND ALL ASSOCIATED SITE WORKS AND INFRASTRUCTURE
The brief summarizes the pattern across all 1,228 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1951902The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief